Sand bypassing is achieved by installing sand pumps under the water that collect the sand before it enters the entrance. The sand is then pumped back to the ocean some distance away from the entrance.
The design and construction of the system is scheduled for completion by late 2009.
A preliminary specification for the new dredge will be developed after the results of the trials of the hopper dredge and sand bypass system are determined.